{"id":5376,"date":"2026-07-07T14:14:53","date_gmt":"2026-07-07T11:14:53","guid":{"rendered":"https:\/\/realux.site\/blog\/designer-and-technical-supervision-in-batumi-what-they-are-how-they-differ-and-why-you-could-lose-your-apartment-without-them\/"},"modified":"2026-07-10T16:45:30","modified_gmt":"2026-07-10T13:45:30","slug":"avtorskiy-i-tehnicheskiy-nadzor-v-batumi","status":"publish","type":"post","link":"https:\/\/realux.site\/en\/blog\/avtorskiy-i-tehnicheskiy-nadzor-v-batumi\/","title":{"rendered":"Designer and Technical Supervision in Batumi: What They Are, How They Differ, and Why You Could Lose Your Apartment Without Them"},"content":{"rendered":"\n<p>An investor bought an apartment while it was still in the foundation phase of a new building on New Boulevard, waited a year and a half for it to be completed\u2014and six months after moving in, discovered a crack running the entire length of the bedroom wall. The reason is simple: the contractor skimped on rebar, and there was no one to check it. That\u2019s how people lose money\u2014not because of a poor design, but because of a lack of oversight during the construction phase.<br\/><br\/><br\/>  <\/p>\n\n<p><strong>Designer supervision<\/strong> and<strong> technical supervision <\/strong>are two different but mandatory mechanisms for protecting investors. The former ensures that construction follows the plans, while the latter ensures that construction is carried out to a high standard, on time, and without cutting corners on materials. In this article, we\u2019ll explain what design supervision is and how it differs from technical supervision, who is required to visit your construction site, what documents must be presented upon request, and how much this protection will cost in 2026.  <\/p>\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a98be63b1791&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a98be63b1791\" class=\"wp-block-image size-large wp-lightbox-container\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"683\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/realux.site\/wp-content\/uploads\/2026\/07\/avtorskiy-i-tehnicheskiy-nadzor-batumi-glavnoe-foto-1024x683.webp\" alt=\"Author's and technical supervision in Batumi\" class=\"wp-image-5171\" srcset=\"https:\/\/realux.site\/wp-content\/uploads\/2026\/07\/avtorskiy-i-tehnicheskiy-nadzor-batumi-glavnoe-foto-1024x683.webp 1024w, https:\/\/realux.site\/wp-content\/uploads\/2026\/07\/avtorskiy-i-tehnicheskiy-nadzor-batumi-glavnoe-foto-300x200.webp 300w, https:\/\/realux.site\/wp-content\/uploads\/2026\/07\/avtorskiy-i-tehnicheskiy-nadzor-batumi-glavnoe-foto-768x512.webp 768w, https:\/\/realux.site\/wp-content\/uploads\/2026\/07\/avtorskiy-i-tehnicheskiy-nadzor-batumi-glavnoe-foto.webp 1536w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n<h2 class=\"wp-block-heading\">What Are Design Supervision and Technical Supervision: Definitions and Scope of Liability<\/h2>\n\n<p><strong>Design supervision <\/strong>is the process of verifying that construction complies with the approved design documentation. It is carried out by the project designer or the design firm, and the procedure in Russian practice is described in SP 246.1325800.2016. Each visit by a specialist is recorded in the design supervision log\u2014including the date, a description of any deviations, and a reference to the relevant section of the design.<\/p>\n\n<p><strong>Technical supervision<\/strong> involves monitoring the quality of materials, construction methods, schedules, and budgets on behalf of the client. It is carried out by a site foreman, a technical supervision engineer, or an independent company, with SP 48.13330.2011 serving as the primary guideline. <\/p>\n\n<h3 class=\"wp-block-heading\">The Difference in Simple Terms<\/h3>\n\n<p>Design supervision answers the question, \u201cAre we building what was designed?\u201d Technical supervision answers the question, \u201cAre we building to a high standard and on schedule?\u201d <\/p>\n\n<table style=\"width:100%; border-collapse:collapse; font-family:Arial, sans-serif; font-size:15px;\">\n  <thead>\n    <tr style=\"background-color:#ec7413; color:#ffffff;\">\n      <th style=\"padding:12px 15px; text-align:left; border:1px solid #d1d1d1;\">Criterion<\/th>\n <th style=\"padding:12px 15px; text-align:left; border:1px solid #d1d1d1;\">Author&#8217;s supervision<\/th>\n <th style=\"padding:12px 15px; text-align:left; border:1px solid #d1d1d1;\">Technical supervision<\/th>\n    <\/tr>\n  <\/thead>\n  <tbody>\n    <tr style=\"background-color:#ffffff;\">\n      <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Object of control<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Compliance with the project<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Quality of materials and technologies<\/td>\n    <\/tr>\n    <tr style=\"background-color:#f7f7f7;\">\n      <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Who performs<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Project author, Chief Engineer<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Foreman, PTO engineer, independent company<\/td>\n    <\/tr>\n    <tr style=\"background-color:#ffffff;\">\n      <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Periodicity<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">According to the visiting schedule<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Every day on site<\/td>\n    <\/tr>\n    <tr style=\"background-color:#f7f7f7;\">\n      <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Document<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Author&#8217;s supervision journal<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">General Work Log, KS-2 Acts<\/td>\n    <\/tr>\n    <tr style=\"background-color:#ffffff;\">\n      <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Benchmark standard<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">SP 246.1325800.2016<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">SP 48.13330.2011<\/td>\n    <\/tr>\n  <\/tbody>\n<\/table>\n\n<p>In Georgia, SNiP and SP do not have official legal force\u2014the country has its own construction legislation, and requirements for on-site supervision are governed by local regulations on building permits. In practice, however, design and construction teams in Batumi use Russian standards as a generally accepted benchmark for quality. <\/p>\n\n<p>There is also a regional reason for stricter regulatory oversight: Batumi\u2019s subtropical climate brings over 2,400 mm of precipitation per year, and the area is classified as seismically active\u20147\u20138 on the MSK-64 scale. Under such conditions, defects in waterproofing and reinforcement become apparent more quickly than in an average region. <\/p>\n\n<h2 class=\"wp-block-heading\">Who oversees the construction site: the chief engineer, the foreman, the construction engineer, and the surveyor<\/h2>\n\n<p>A team of specialists oversees the quality of construction in Batumi, with each member having their own area of responsibility.<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>The Chief Project Engineer (CPE) <\/strong>coordinates design supervision, approves material substitutions, authorizes deviations from the design, and is responsible to the client for design decisions.<\/li>\n\n\n\n<li><strong>The foreman<\/strong> is a key link in the technical supervision process on site. He oversees the daily sequence of work, issues instructions to crew leaders, and maintains a general work log. <\/li>\n\n\n\n<li><strong>Construction Engineer<\/strong> \u2014 reviews construction drawings, certificates of concealed work, survey plans, and material certificates.<\/li>\n\n\n\n<li><strong>Surveyor <\/strong>\u2014 monitors the geometry of structures, layout axes, and elevation marks; checks survey as-built drawings before signing the completion certificates.<\/li>\n\n\n\n<li><strong>Foreman <\/strong>\u2014 receives instructions from the site supervisor and is responsible for ensuring that the work crew directly complies with the technical requirements.<\/li>\n<\/ul>\n\n<p>The same team of specialists also oversees the construction of a private home from the ground up\u2014on challenging sites, such as those on a slope, the scope of supervision only increases. You can see examples of what this looks like in practice in <u><a href=\"https:\/\/realux.site\/projects\/\">Realux\u2019s portfolio of completed projects<\/a><\/u>. <\/p>\n\n<h2 class=\"wp-block-heading\">How a foreman and engineer supervise a site: daily procedures<\/h2>\n\n<p>Technical supervision is not a one-time inspection, but a daily algorithm.<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Checking the layout and geometry of structures before starting the stage.<\/li>\n\n\n\n<li>Incoming inspection of materials\u2014verification against certificates and specifications, and checking for the <strong>substitution of materials<\/strong> with cheaper alternatives.<\/li>\n\n\n\n<li>Control of the technological sequence of works.<\/li>\n\n\n\n<li>Interacting with the foreman &#8211; issuing orders during the shift.<\/li>\n\n\n\n<li>Acceptance of the stage and recording of the result in the general work log.<\/li>\n<\/ul>\n\n<p>It is at this stage that attempts to cut corners at the client\u2019s expense are most often detected\u2014an unscrupulous contractor counts on the fact that minor substitutions of materials will go unnoticed.<\/p>\n\n<p>If construction is already underway but technical supervision has not yet been established, it is advisable to initiate supervision immediately, rather than after the completion of the next phase: a specialist can conduct an audit of the work already completed based on available documentation and reports on concealed work to document the current condition of the project.<\/p>\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a98be63b2585&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a98be63b2585\" class=\"wp-block-image size-large wp-lightbox-container\"><img decoding=\"async\" width=\"1024\" height=\"683\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/realux.site\/wp-content\/uploads\/2026\/07\/raznica-avtorskiy-tehnicheskiy-nadzor-shema-1024x683.webp\" alt=\"Author's and technical supervision in Batumi\" class=\"wp-image-5172\" srcset=\"https:\/\/realux.site\/wp-content\/uploads\/2026\/07\/raznica-avtorskiy-tehnicheskiy-nadzor-shema-1024x683.webp 1024w, https:\/\/realux.site\/wp-content\/uploads\/2026\/07\/raznica-avtorskiy-tehnicheskiy-nadzor-shema-300x200.webp 300w, https:\/\/realux.site\/wp-content\/uploads\/2026\/07\/raznica-avtorskiy-tehnicheskiy-nadzor-shema-768x512.webp 768w, https:\/\/realux.site\/wp-content\/uploads\/2026\/07\/raznica-avtorskiy-tehnicheskiy-nadzor-shema.webp 1536w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n<h2 class=\"wp-block-heading\">Supervision documentation: what documents are maintained at the facility and why are they needed?<\/h2>\n\n<p>Without a paper trail, no violation has legal force. Let&#8217;s examine the key documents. <\/p>\n\n<table style=\"width:100%; border-collapse:collapse; font-family:Arial, sans-serif; font-size:15px;\">\n  <thead>\n    <tr style=\"background-color:#ec7413; color:#ffffff;\">\n      <th style=\"padding:12px 15px; text-align:left; border:1px solid #d1d1d1;\">Document<\/th>\n <th style=\"padding:12px 15px; text-align:left; border:1px solid #d1d1d1;\">Purpose<\/th>\n <th style=\"padding:12px 15px; text-align:left; border:1px solid #d1d1d1;\">Who&#8217;s leading?<\/th>\n    <\/tr>\n  <\/thead>\n  <tbody>\n    <tr style=\"background-color:#ffffff;\">\n      <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Author&#8217;s supervision journal<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Date, description of the violation with a link to the project, deadline for rectification, signatures<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Project author, Chief Engineer<\/td>\n    <\/tr>\n    <tr style=\"background-color:#f7f7f7;\">\n      <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">General Work Log<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">All stages of construction, deviations from the schedule, regulations<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Foreman<\/td>\n    <\/tr>\n    <tr style=\"background-color:#ffffff;\">\n      <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Certificate of Concealed Work<\/td>\n<td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Verification of work prior to enclosing structures\u2014foundation, rebar, waterproofing<\/td>\n<td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Construction Engineer, Surveyor<\/td>\n    <\/tr>\n    <tr style=\"background-color:#f7f7f7;\">\n      <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Certificate of Completion (KS-2)<\/td>\n<td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Scope and Cost of Construction Work Performed<\/td>\n<td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Technical Supervision, Construction Engineer<\/td>\n    <\/tr>\n    <tr style=\"background-color:#ffffff;\">\n      <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Survey As-Built Plan<\/td>\n<td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Drawing of Actual Axis Elevations and Heights<\/td>\n<td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Surveyor<\/td>\n    <\/tr>\n  <\/tbody>\n<\/table>\n\n<p><strong>As-built documentation<\/strong> is a comprehensive set of reports, diagrams, and protocols that are reviewed by the construction supervision engineer and the technical inspector before the project is handed over. The absence of any of these documents is a cause for concern, even if the construction site appears to be in good order. <\/p>\n\n<h2 class=\"wp-block-heading\">Typical violations and their consequences<\/h2>\n\n<p>Five categories of violations are most frequently encountered at facilities in Batumi:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>Substitution of materials<\/strong> \u2014 replacing certified material with a cheaper or uncertified alternative.<\/li>\n\n\n\n<li>Deviations from geometry &#8211; displacement of axes, incorrect elevation marks.<\/li>\n\n\n\n<li>Failure to follow the proper procedure\u2014shortening drying times, omitting waterproofing layers.<\/li>\n\n\n\n<li>Project errors that are only revealed on-site.<\/li>\n\n\n\n<li>Unauthorized changes without the approval of the Chief Project Engineer.<\/li>\n<\/ul>\n\n<p>To document such incidents, <strong>photographs are taken<\/strong>\u2014including the date, time, and a description\u2014which gives the photograph legal validity as an attachment to the construction supervision log. After the violation is documented, the site supervisor or the chief construction inspector issues a <strong>corrective action order<\/strong>, which is forwarded to the foreman or directly to the contractor. <\/p>\n\n<h2 class=\"wp-block-heading\">Troubleshooting procedure: from fixing to checking<\/h2>\n\n<p>Work with the identified violation is based on a clear algorithm:<\/p>\n\n<ol class=\"wp-block-list\">\n<li>Recording the violation in the author&#8217;s supervision or general works log.<\/li>\n\n\n\n<li>Supplementing the recording with photographic evidence.<\/li>\n\n\n\n<li>Issuance of an order for rectification with an indication of the deadline.<\/li>\n\n\n\n<li>Notification of the contractor and, if necessary, the foreman.<\/li>\n\n\n\n<li>Post-expiration control check.<\/li>\n\n\n\n<li>Signing the report\u2014either confirming that the violation has been corrected or noting a repeat violation, which will result in penalties.<\/li>\n<\/ol>\n\n<p>If the contractor systematically fails to comply with the terms of the contract, the contract may be terminated\u2014this should be specified in advance, during the stage of negotiating the terms.<\/p>\n\n<h2 class=\"wp-block-heading\">How Much Does Property Management Cost in Batumi: A Comparison of Options and Where You Shouldn&#8217;t Skimp<\/h2>\n\n<p>The cost of technical supervision is typically calculated as a percentage of the construction estimate\u2014roughly 3 to 7 percent\u2014or as a fixed monthly rate. The exact figure depends on the area, the complexity of the project, and the topography of the site, so it\u2019s best to request a quote tailored to the specific project. The client has three main options for organizing supervision.  <\/p>\n\n<table style=\"width:100%; border-collapse:collapse; font-family:Arial, sans-serif; font-size:15px;\">\n  <thead>\n    <tr style=\"background-color:#ec7413; color:#ffffff;\">\n      <th style=\"padding:12px 15px; text-align:left; border:1px solid #d1d1d1;\">Option<\/th>\n <th style=\"padding:12px 15px; text-align:left; border:1px solid #d1d1d1;\">Price<\/th>\n <th style=\"padding:12px 15px; text-align:left; border:1px solid #d1d1d1;\">Scope of control<\/th>\n <th style=\"padding:12px 15px; text-align:left; border:1px solid #d1d1d1;\">Risks<\/th>\n    <\/tr>\n  <\/thead>\n  <tbody>\n    <tr style=\"background-color:#ffffff;\">\n      <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">The developer&#8217;s full-time engineer<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Average<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Depends on the object loading<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Conflict of interest with the contractor<\/td>\n    <\/tr>\n    <tr style=\"background-color:#f7f7f7;\">\n      <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Independent company<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Above average<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Complete, no conflict of interest<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Requires a separate budget<\/td>\n    <\/tr>\n    <tr style=\"background-color:#ffffff;\">\n      <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Developer&#8217;s foreman<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Below average<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Limited<\/td>\n <td style=\"padding:10px 15px; border:1px solid #d1d1d1;\">Combining roles reduces objectivity<\/td>\n    <\/tr>\n  <\/tbody>\n<\/table>\n\n<p>Cutting corners on supervision usually results in more expensive repairs to defects after the project is completed\u2014cracks, leaks, and uneven geometry end up costing the client many times more than inspections during the construction phase. The cost of building a house in Batumi and where the budget goes\u2014we\u2019ve broken this down separately in an<u><a href=\"https:\/\/realux.site\/en\/blog\/stoimost-stroitelstva-doma-v-batumi-polnaya-struktura-rashodov-na-sklone\/\"> article on the overall cost structure of building on a slope.<\/a><\/u> <\/p>\n\n<h2 class=\"wp-block-heading\">How to choose a contractor for technical supervision: a checklist for developers and investors<\/h2>\n\n<p>Before entrusting quality control to a specific specialist or company, it\u2019s worth checking the following six points:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Qualifications and membership in relevant self-regulatory organizations.<\/li>\n\n\n\n<li>Work experience specifically in Batumi\u2014taking into account the climate, seismic conditions, and local characteristics of new construction projects.<\/li>\n\n\n\n<li>A well-established team\u2014a foreman, a construction engineer, and a surveyor.<\/li>\n\n\n\n<li>Transparent Document Workflow \u2014 Sample Logs and Records Prior to Signing the Contract.<\/li>\n\n\n\n<li>Legal Basis \u2014 The right of the technical supervisor to issue directives and block progression to the next stage without signed inspection reports.<\/li>\n\n\n\n<li>A portfolio of completed projects, with the option to contact previous clients.<\/li>\n<\/ul>\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a98be63b34b6&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a98be63b34b6\" class=\"wp-block-image size-large wp-lightbox-container\"><img decoding=\"async\" width=\"1024\" height=\"683\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/realux.site\/wp-content\/uploads\/2026\/07\/fotofiksaciya-narusheniy-stroyka-batumi-1024x683.webp\" alt=\"Author's and technical supervision in Batumi\" class=\"wp-image-5173\" srcset=\"https:\/\/realux.site\/wp-content\/uploads\/2026\/07\/fotofiksaciya-narusheniy-stroyka-batumi-1024x683.webp 1024w, https:\/\/realux.site\/wp-content\/uploads\/2026\/07\/fotofiksaciya-narusheniy-stroyka-batumi-300x200.webp 300w, https:\/\/realux.site\/wp-content\/uploads\/2026\/07\/fotofiksaciya-narusheniy-stroyka-batumi-768x512.webp 768w, https:\/\/realux.site\/wp-content\/uploads\/2026\/07\/fotofiksaciya-narusheniy-stroyka-batumi.webp 1536w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n<p>Working without a contract with a technical supervision agency is a common risk: in this case, the instructions have no legal force, and photographic evidence of violations cannot be used as grounds for claims. If you need advice on organizing supervision at your site\u2014whether you\u2019re building a house from scratch or overseeing a construction project that\u2019s already underway\u2014you can <u><a href=\"https:\/\/realux.site\/en\/contact\/\">reach out to the Realux team<\/a><\/u>: we\u2019ll help you determine which supervision option is best suited for your specific project. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>An investor bought an apartment while it was still in the foundation phase of a new building on New Boulevard, waited a year and a half for it to be completed\u2014and six months after moving in, discovered a crack running the entire length of the bedroom wall. The reason is simple: the contractor skimped on [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5377,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"yasr_overall_rating":0,"yasr_post_is_review":"","yasr_auto_insert_disabled":"","yasr_review_type":"","footnotes":""},"categories":[50,53],"tags":[],"class_list":["post-5376","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-useful-article","category-uncategorized"],"yasr_visitor_votes":{"stars_attributes":{"read_only":false,"span_bottom":false},"number_of_votes":1,"sum_votes":5},"_links":{"self":[{"href":"https:\/\/realux.site\/en\/wp-json\/wp\/v2\/posts\/5376","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/realux.site\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/realux.site\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/realux.site\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/realux.site\/en\/wp-json\/wp\/v2\/comments?post=5376"}],"version-history":[{"count":1,"href":"https:\/\/realux.site\/en\/wp-json\/wp\/v2\/posts\/5376\/revisions"}],"predecessor-version":[{"id":5378,"href":"https:\/\/realux.site\/en\/wp-json\/wp\/v2\/posts\/5376\/revisions\/5378"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/realux.site\/en\/wp-json\/wp\/v2\/media\/5377"}],"wp:attachment":[{"href":"https:\/\/realux.site\/en\/wp-json\/wp\/v2\/media?parent=5376"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/realux.site\/en\/wp-json\/wp\/v2\/categories?post=5376"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/realux.site\/en\/wp-json\/wp\/v2\/tags?post=5376"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}